The performance of MySE5.5-155 in Xinhua Bay Farm
-
Date: 2024.02.23
In Xinhua Bay Wind farm,The availability of twooffshore MySE5.5-155 wind turbines is over 99.9%,and the total generationof October has already overfilled 4.6GWh.
In Xinhua Bay Wind farm,The availability of twooffshore MySE5.5-155 wind turbines is over 99.9%,and the total generationof October has already overfilled 4.6GWh.